Logo

Commercial Arc Flash Study - 5-day turnaround

CA$3,500

Scope of Work:

  • Provide an arc flash and coordination study report per IEEE 1584, CSA Z462, and the specifications and drawings.
  • 5-day lead time: The stamped report shall be provided within five business days of receipt of all customer-provided input data — no delay to your ordering equipment!
  • Scope includes providing the arc flash labels.
  • Stamped by a Professional Engineer.
  • Commercial facilities covered (typical office, retail, multi-tenant, etc.).

Format: Deliverable-based remote service

Clarifications

  • All input data for the study, including utility fault data, cable lengths, and equipment nameplates, shall be provided by others in an organized electronic format.
  • The scope of work does not include other studies or designs (e.g., load flow, motor starting, equipment sizing, etc.).

Investment

  • The scope of work is estimated to be $3,500 CAD.
  • 100% payment milestone on submittal of all deliverables within the scope of work. Payment terms Net 30.
  • Price is subject to adjustment based on review of the customer-provided single-line diagram.